Typical MVC Installation
Installation
for the ENCON MVC Evaporator is very straight
forward and is generally handled by facilities, maintenance,
or plant engineering personnel. Primary connections include
plumbing from the holding tank, sump, or pit to the wastewater feed
connection (1), plumbing from the residue pump connection (2), to
the residue tank, plumbing from the distillate pump connection (3)
to the distillate holding tank, and plumbing from the cleaning solution
holding tank to the cleaning solution feed line (4).
Finally, 480 Volt, 3 phase power is run to the main power disconnect switch located behind the operator interface panel (5). All primary components including feedstock pump, recirculation pump, vapor compressor, concentrate discharge pump, level probes, conductivity meter, etc. are pre-wired and pre-plumbed within the boundaries of the MVC.
Below is a typical layout of the ENCON MVC Evaporator.
Click on images for full-size view & details.
Uses for the Mechanical Vapor Compression Evaporator
Potable Drinking Water and Potable Water Generation
Desalination
Distillation
Wastewater Recycling
Wastewater Treatment
Wastewater Minimization