![]() |
![]() |
|
ENCON Evaporators |
Drum Evaporator/Dryer Process Description
|
|||||||
Drum Evaporator Batch Operation Step 1:
Wrap the rope gasket around the drum so that a positive seal will be made when the clamshell walls are closed |
|
|
Close the clamshell walls and secure the lid with latching handles. The evaporator stack is then connected to the flexible section of the permanent exhaust stack with a quick disconnect fitting. Batch Operation Step 4: Run the supply power to the top of the disconnect switch and through the bottom of the control panel enclosure. Batch Operation Step 5: With the main power on, allow the system to heat up to boiling temperature. The system will shutdown upon reaching the low level or high temperature set point which is factory set in your control panel. |
|
The ENCON Drum Evaporator/Dryer can be modified to run in the auto-fill mode (optional high level probe required). This mode requires plumbing from a feed pump to the inlet on the top of the evaporator lid. This allows the automatic and continuous refilling of the evaporator between the height of the two level probes until either the high temperature set point is reached or there is no longer water to be processed in the holding tank (See Typical Drum Evaporator Installation). |
![]() |
Copyright © 2007 ENCON Water Systems Inc. All Rights Reserved
Web Support New Hampshire Web Design